Streamview变电站
重建 & 扩建工程 

图像
Streamview变电站

概述

Our mission is to provide our 3.7 million 客户 with clean, safe and reliable energy. 要做到这一点, we continue to modernize and upgrade existing substations and infrastructure so our 客户 get the reliable energy they deserve. We started work on the Streamview变电站 重建 and 扩建工程 November 2022. 一旦完成, it will improve reliability and the integrity of our electric system for communities in the mid-city San Diego area. These communities have experienced sizeable growth in the past decade and are forecast to grow even more over the next ten years. Additional residents and businesses mean a greater demand on existing power lines.

Del Mar Project 项目的好处

项目的好处

  • Improves reliability of the electric transmission and distribution systems
  • Enhances safety by upgrading the existing 1950s aging infrastructure
  • Helps prevent unplanned outages in 西班牙&E’s service territory 
  • Accommodates future load growth

项目简介

The Streamview变电站 is in the Chollas View/College area within San Diego. All the upgrades will take place on existing 西班牙&E property within existing rights of way. The project will rebuild and expand 西班牙&E’s existing 69/12kV Streamview变电站 to better meet current engineering standards and improve reliability. The project also includes upgrades to existing overhead transmission and underground distribution lines that extend beyond the Streamview变电站 site.

图像
项目简介

项目进度

建设 – Q4 2022 through Q4 2026

在职日期 – Q4 2026

277.75 KB
PDF
Download the Streamview变电站 重建 & 扩建工程 Fact Sheet
Download the Streamview变电站 重建 & 扩建工程 Fact Sheet
图像
期待什么

期待什么

Traffic delays and temporary lane closures are expected. 西班牙&E plans to have traffic control measures in place during construction and our crews will strive to minimize any impacts to you and your neighbors. 建设 activities at this location may occur intermittently. 工作时间, traffic control measures and 噪音 restrictions for each area are established by local jurisdictions.

项目地图

Streamview 项目地图

 

建设 通知 and Updates

252.10 KB
PDF
2022.11.18 Streamview变电站 Distribution Pre-建设 Letter
2022.11.18 Streamview变电站 Distribution Pre-建设 Letter
221.94 KB
PDF
2022.7.20 Streamview变电站 Demo 建设 Notification Letter
2022.7.20 Streamview变电站 Demo 建设 Notification Letter

Frequently Asked Questions

View the project FAQs below or download the PDF 在这里.

This project will replace aging electric service equipment and improve the safety and reliability of electric transmission and distribution systems for the Chollas View and College areas of the City of San Diego.

The project scope includes:

  • Replacing aging infrastructure installed in the 1950s
  • Upgrading overhead transmission lines & existing underground distribution lines
  • Enhancing safety upgrades to help prevent unplanned outages in 西班牙&E’s service territory
  • Providing additional capacity to serve existing and future electrical load growth.

As our region expands, the demand for energy also grows. Given the load growth over the past decade in the mid-city San Diego area, increased demand for energy has created congestion on the existing power lines which causes a strain on the electric system. The substation expansion will provide additional capacity and system reliability for the area.

The project is located on a triangular piece of land bounded by Lea Street to the north, 54th Street to the west and Chollas Parkway to the southeast in the City of San Diego Chollas View and College areas. This project includes construction activities at 西班牙&E’s existing Streamview变电站 which includes newly acquired parcels that are adjacent to the existing site.

The community is made up of mixed residential and commercial districts. Some major 客户 in this area include San Diego State University, the City of San Diego, SD Unified School District, AT&T, Verizon, T-Mobile and the Salvation Army.

A laydown yard (also called a staging area) is a location typically near a construction site w在这里 tools, 材料, equipment and vehicles are stored temporarily when they are not in use. The laydown yard for this project is located east of the Burlington Department Store and south of University Avenue. It is desirable for the laydown yard to be in close proximity to the active construction site to minimize impact on traffic, 噪音, 等. 为社区服务. Access to and from this location will occur from Chollas Parkway.

T在这里 will be intermittent 噪音, 然而, work will be performed in compliance with the City of San Diego 噪音 ordinance. While the ordinance allows for work to be performed from 7 a.m. 到晚上7点.m., Monday through Saturday, most of the work will be performed approximately between 7 a.m. 和4p.m., Monday through Friday. Crews will not perform work on holidays or Sundays except under extreme or emergency conditions.

建设 is expected to end Q4 2026.

Overall, the impact on surrounding traffic will be minimal. T在这里 will be times when our trucks and equipment are coming and going from the substation which may cause some traffic. 除了, t在这里 will be an occasional shoulder closure, lane closure or manned traffic control to complete portions of the work. Work that could impact traffic and the public will be performed in accordance with traffic control and other permits issued and monitored by the City of San Diego.

西班牙&E’s top priority is safety. This project is no different from many other electric infrastructure upgrades and projects 西班牙&E® undertakes throughout the region. All infrastructure within the transmission and distribution systems is designed, 构造, operated and maintained in accordance with strict state and federal safety regulations.

西班牙&E has a comprehensive and proactive safety program to ensure the integrity of the system and the protection of our communities, 客户, employees and infrastructure.

你可浏览我们的 hntcwedding.com/Major-Projects for more information or call the project information line at 1-844-765-6388.

更多的信息

If you have questions, please call the Project information Line at 1-844-765-6388.